扒开双腿被两个男人玩弄视频,国产精品xxx在线,97se亚洲国产综合在线,夜夜夜高潮夜夜爽夜夜爰爰

Dual-mode TBM

Dual-mode TBM is mainly applied to big geology difference, long distance construction of tunneling project. Dual-mode TBM in the construction can according to hydrogeological condition change mode, to achieve that improve the rate of construction and reduce the cost of construction. Dual mode TBM has two type deslag mode or two type pressure balance mode’s full fracture surface TBM. Currently, have earth pressure, slurry Dual-mode TBM and earth pressure, rock Dual-mode TBM.

Dual-mode TBM which is produced by our company is a kind of derived equipment between balance TBM and shield rock TBM, have two different type TBM’s technical feature at the same time. When construction section geology appear large change, TBM handover suitable working mode, can make sure the safety and rate of construction, and can make sure the efficiency of whole construction. Currently, our company has produced more than 10 sets of such type TBM, mainly exported to Middle East.

TEL:+86 24 67859165;+86 24 67859170.E-mail:nhi-international@nhi.com.cn

 

主站蜘蛛池模板: 全椒县| 鹤峰县| 随州市| 杭州市| 林西县| 永胜县| 武宁县| 扬中市| 都昌县| 淮安市| 唐河县| 红安县| 津市市| 潜江市| 南汇区| 岳西县| 洪江市| 阳山县| 隆回县| 郓城县| 名山县| 新和县| 敖汉旗| 子长县| 富川| 商南县| 吴旗县| 莒南县| 明光市| 镇宁| 泸水县| 泸西县| 江安县| 浏阳市| 甘孜| 祁阳县| 杭州市| 凤翔县| 焦作市| 敦煌市| 日照市|